0704 814 191 hello@renkelly.com Brisma Towers, Ongata Rongai
Mon – Sat, 8am – 6pm
Get a quote
Power floating · Thika & Ruiru

Power float contractors in Thika & Ruiru.

The Thika Superhighway corridor is one of Kenya’s busiest areas for new factories and warehouses. It is a short trip from our base, and we work in Thika, Ruiru, Juja and Tatu City regularly.

No mobilisation feeFree site visitFrom Ksh 250/sqm
Renkelly power floating a concrete slab, serving Thika & Ruiru
21+

years finishing floors since 2005

500+

projects completed across Kenya

300k+

square metres of floor finished

30 min

WhatsApp reply time in working hours

Local know-how

Power floating in Thika & Ruiru, done properly

Factory floors here often carry steel-wheeled trolleys and heavy machinery. For these floors we recommend a dry-shake hardener and properly cut joints, to stop surface wear and damage at the joint edges.

Every Thika & Ruiru job gets the same Renkelly standard: a pre-pour site check, our own ride-on or walk-behind machines, a dry-shake hardener where traffic needs it, joints cut on time and curing from day one.

Areas we cover around Thika & Ruiru

Thika Industrial AreaRuiruTatu CityJujaKenolThika Superhighway corridor
Renkelly team on a project serving Thika & Ruiru
FAQ

Questions from Thika & Ruiru clients

Do you do power floating in Thika & Ruiru?

Yes. We power float warehouse, factory, commercial and residential slabs in Thika & Ruiru and nearby areas, including Thika Industrial Area, Ruiru, Tatu City.

How much does power floating cost in Thika & Ruiru?

Power floating starts from Ksh 250 per sqm. Sites in Nairobi and the surrounding counties do not usually carry a mobilisation charge. You get a fixed written quote after a free site visit.

How long does a power-floated floor take to cure before use?

You can walk on it after 24 hours and allow light foot traffic within 2 – 3 days. Wait about 7 days before light vehicles and 28 days before heavy forklifts or full racking loads, so the concrete reaches its design strength. Keep the slab moist or under a curing compound for at least the first 7 days.

What is the difference between power floating and an ordinary screed?

Power floating finishes the structural slab itself while it is still fresh, so the surface is part of the concrete. An ordinary screed is a separate layer laid later, which can crack, sound hollow or delaminate. A power-floated floor is flatter, denser and more durable. It usually costs less too, because there is no second layer.

Free site visit · No obligation

Get a Thika & Ruiru quote

Three quick steps. Your details open in WhatsApp, ready to send to our lead engineer.

  • Starting from Ksh 250 per sqm
  • A fixed written quote after a free site visit
  • Our own ride-on & walk-behind machines and trained crew
  • A workmanship warranty on every job
Renkelly crew in branded uniforms and helmetsReplies come from a lead engineer, not a call centre.

Step 1 of 3

What are we finishing?

Building Stronger Together

Pouring soon? Let’s plan your floor.

Send your area and location. A lead engineer replies within 30 minutes during working hours.

Chat with us
Call WhatsApp Quote