Logistics warehouse
Athi River · 4,800 sqm
Power floating + dry-shake hardenerRenkelly power floats warehouse, factory and commercial slabs across Kenya. We bring our own machines, finish your slab on pour day and hand over a flat, dense, dust-free floor.
Ksh 250/sqm starting rate. Your fixed quote follows a free site visit.



15-strong specialist crewOwn ride-on & walk-behind fleet
years finishing floors since 2005
projects completed across Kenya
square metres of floor finished
WhatsApp reply time in working hours
We finish every kind of slab. Our specialty is industrial and commercial floors: big areas, heavy loads and tight pour windows.

High-bay racking and forklifts need a floor that is flat, tough and dust-free from wall to wall. Our ride-on trowels finish big bays within one pour window.
What we usually specify

Steel-wheeled trolleys, machine bases and spills wear out ordinary concrete fast. We harden the surface and protect the joints so the floor lasts as long as the building.
What we usually specify

A clean, modern floor that looks good on opening day and stays easy to maintain. Polished or sealed concrete costs less over its life than tiles.
What we usually specify

Forecourts, service bays and parking decks take fuel, oil and constant wheel traffic. We finish them dense and give them grip where cars turn and brake.
What we usually specify

A power-floated house slab is smooth and level, ready for tiles, vinyl or wood, or sealed as the final floor. It saves you the cost of a separate screed.
What we usually specify
Power floating is all about timing. Here is what happens from the day before the pour to handover.
We confirm levels, screed rails, access for the trucks and the pour sequence with your contractor. We also check the mix and slump.
The concrete is placed, vibrated and struck off to level. Our crew and machines are already on site before the first truck arrives.
When a boot leaves only a 3 – 5mm print, the floats go on. Pans flatten the surface and bring up paste.
Where specified, a dry-shake hardener is broadcast and floated into the surface so it becomes part of the slab.
Blades come off the pans and the angle steepens with each pass, compacting and closing the surface to the finish you chose.
Control joints are saw-cut at the right spacing and curing starts straight away, so the slab cracks where we want it to.
Foot traffic after 2 – 3 days, light vehicles after 7, full racking and forklift loads at 28 days.
Times are typical and change with weather, mix and slab thickness. We finish to the concrete, not the clock.
A flat, dense, hard-wearing surface finished while the concrete is still workable. There is no separate screed layer to crack or delaminate.
Learn moreCloses the surface for a smooth, low-dust, easy-to-clean finish. We can burnish it to a sheen where you want one.
Learn moreGets the floor level and to the right falls before finishing, so water drains where it should and racking sits true.
Learn moreMuch higher abrasion resistance than plain concrete, less dusting and a longer floor life under heavy traffic.
Learn moreA sealed, glossy, low-maintenance floor that reflects light, with no tiles to crack or grout to clean.
Learn moreA seamless, hygienic coating that resists chemicals, with optional anti-slip grit and line marking.
Learn moreBrings a tired floor back into service without breaking it out.
Learn moreSwitch between the two to see the difference. Most cracked, dusty and hollow-sounding floors we repair were screeded.
Read the FAQ
One solid layer
Two layersAthi River · 4,800 sqm
Power floating + dry-shake hardenerRuiru · 2,600 sqm
Power floating & trowelingMombasa (Miritini) · 3,200 sqm
Screeding + power floatingMombasa Road, Nairobi · 900 sqm
Power float + epoxy coatingKitengela · 1,800 sqm
Power floating with broom finishOngata Rongai · 1,500 sqm
Power floating house slabsContractors, developers and facility managers call us back because the floor is right the first time.
“The crew was on site before the first truck arrived and finished the whole bay the same evening. Our racking went up flat, and the floor hasn’t dusted since.”
“We had used screed contractors before and fought cracks every year. Renkelly’s power-floated floor with hardener is a different class. Clear quote, no surprises.”
“They visited the site, explained the options in plain terms, and the finish on our house and garage slab is smooth enough to live on without tiles.”
Based in Ongata Rongai, working from Mombasa to Eldoret. Pick your town.
Our office is at Brisma Towers in Ongata Rongai, so Nairobi sites get our fastest response. A free site visit usually happens within a day or two of your call.
Port-side godowns, container freight stations and cold stores need floors that handle forklifts all day. We bring our crew and machines to the coast for these projects.
Nakuru’s growth as a city has brought new warehouses, agro-processing plants and commercial buildings. We power float slabs across Nakuru County, including Naivasha.
We take power floating crews to Kisumu and the lake region for warehouses, factories, commercial buildings and housing developments.
Grain depots, milk processors and new commercial buildings across Uasin Gishu need tough floors. We bring our ride-on and walk-behind floats to Eldoret for these jobs.
The Thika Superhighway corridor is one of Kenya’s busiest areas for new factories and warehouses. It is a short trip from our base, and we work in Thika, Ruiru, Juja and Tatu City regularly.
Athi River, the EPZ and Mlolongo are full of logistics parks, godowns and factories, and Kitengela is growing fast with estates and commercial buildings. Both are close to our Ongata Rongai base.
What drives the price per sqm, how to budget a warehouse or house slab, and 10 questions to ask any flooring contractor. We send it to your WhatsApp as a PDF.
You can walk on it after 24 hours and allow light foot traffic within 2 – 3 days. Wait about 7 days before light vehicles and 28 days before heavy forklifts or full racking loads, so the concrete reaches its design strength. Keep the slab moist or under a curing compound for at least the first 7 days.
We use a dry-shake hardener where traffic is heavy, cure the slab from day one, and saw-cut control joints within 24 hours at the right spacing so any cracking happens inside the joint. Good sub-base compaction, the correct concrete grade and no extra water in the mix matter just as much, and we check all of these before the pour.
Usually 125mm (5 in) for homes, garages and light-duty floors, 150 – 200mm for warehouses and commercial floors, and up to 300mm (12 in) for heavy industrial loads. Your structural engineer sets the final figure, and we finish to whatever the design calls for.
Power floating finishes the structural slab itself while it is still fresh, so the surface is part of the concrete. An ordinary screed is a separate layer laid later, which can crack, sound hollow or delaminate. A power-floated floor is flatter, denser and more durable. It usually costs less too, because there is no second layer.
Yes. A power-floated house slab is smooth, level and ready for tiles, vinyl or wood. You can also seal it and use it as the final finish. It saves the cost of a separate screed.
Tiles look good but can crack, sound hollow and need their grout cleaned. A sealed or polished power-floated floor has no joints to fail, handles heavy loads and costs less per square metre. Many clients power float the slab and tile only some rooms.
Three quick steps. Your details open in WhatsApp, ready to send to our lead engineer.
Replies come from a lead engineer, not a call centre.Building Stronger Together
Send your area and location. A lead engineer replies within 30 minutes during working hours.